Projects · Wastewater · 04

TVRWRF Boiler Installation

A packaged boiler installed within an operating regional water reclamation facility, with the piping, supports and connections to put it into service.

Owner
Eastern Municipal Water District
Location
Temecula, CA
Facility
Temecula Valley Regional Water Reclamation Facility
Type
Wastewater

What SCW built

  • Boiler rigging, setting and anchorage on an equipment pad
  • Piping, valves and connections into the existing pipe rack
  • Pipe supports and access platforms

Operating conditions

Installed among live process piping in an operating water reclamation facility.

Approach

Mechanical and process equipment installation is a published SCW scope; the supports visible in the photography fall under SCW’s misc. metals scope.