Projects · Water · 06
Skymeadows / Los Pinos PS Improvements
Improvements at two existing pump stations: above-grade piping and valving, electrical enclosures and steel canopies.

What SCW built
- Above-grade piping and valve replacement
- Electrical enclosures and steel canopy
- Site fencing
Operating conditions
Improvements at existing, in-service pump stations.
Approach
Canopy steel is a published misc. metals scope; mechanical work is a published water | wastewater scope.
