Projects · Water · 02
Robert A. Weese WFP Solids Handling Lagoons
Solids handling lagoons for the City of Oceanside’s filtration plant: graded basins with cast-in-place concrete walls, access roads and perimeter guardrail.

What SCW built
- Earthwork and grading of the lagoon basins
- Cast-in-place concrete lagoon walls and ramps
- Perimeter guardrail, access roads and site drainage
Operating conditions
The filtration plant supplies potable water to the city and stayed in production while the lagoons were built.
Approach
Excavation, structural concrete and misc. metals (guardrail) are all published SCW scopes, so the lagoon work sits within what SCW’s own crews perform.
